Origin & destination must be different!
Bus services coming soon! We are currently integrating operators.

Mahanagar Godhuli Train (703) Complete Guide

Welcome to our comprehensive, passenger-first guide to the Mahanagar Godhuli, a prominent intercity express train operating in Bangladesh under Bangladesh Railway. Known for its speed, punctuality, and comfortable seating classes, it connects key regional hubs smoothly. The official train codes are 703 for the primary route.

Total Duration 5 hrs 45 mins
Stoppage Stations 10 Stops
Weekly Schedule Daily (7 Days)
Weekly Off-Days None

Mahanagar Godhuli Time Schedule & Time Table

Updated for July, 2026

Below is the official comparative travel timeline of the Mahanagar Godhuli. This summary highlights departures, arrivals, and travel times across the routes. Use this schedule to coordinate your transit details accurately.

Route Direction Departure Time Arrival Time Travel Time
Chattogram to Dhaka (703) 03:00 PM 08:45 PM 5 hrs 45 mins

Mahanagar Godhuli Route & Stoppage Stations List

The Mahanagar Godhuli travels a carefully scheduled course, stopping only at high-priority intercity junctions. The sequence below shows the stations chronologically. Make sure to plan your boarding or deboarding according to these designated stoppage points.

Route Map

Mahanagar Godhuli Route Map

This schematic diagram represents the independent stoppage sequence for both directions of Mahanagar Godhuli.

Detailed Station Timetable & Halt Durations

Direction 1: Chattogram to Dhaka (703)
Seq Station Arrival Departure Halt (mins) Travel Time
1 Chattogram Origin (Starts here) 03:00 PM -- --
2 Feni 04:20 PM 04:22 PM 2 min 1h 20m
3 Gunabati 04:36 PM 04:38 PM 2 min 0h 14m
4 Laksam 05:04 PM 05:06 PM 2 min 0h 26m
5 Cumilla 05:27 PM 05:29 PM 2 min 0h 21m
6 Akhaura 06:20 PM 06:23 PM 3 min 0h 51m
7 Brahmanbaria 06:41 PM 06:45 PM 4 min 0h 18m
8 Bhairab Bazar 07:05 PM 07:08 PM 3 min 0h 20m
9 Narsingdi 07:36 PM 07:38 PM 2 min 0h 28m
10 Dhaka 08:45 PM Terminates (Ends here) -- 1h 7m

Mahanagar Godhuli Ticket Price

Ticket prices are set strictly in accordance with Bangladesh Railway's official distance matrices. Below is a simple class-by-class pricing directory for the full-length intercity route.

Seat Class Fare (BDT)
Shovon 320 ৳
Shovon Chair 445 ৳
Snigdha (AC Chair) 850 ৳
AC Seat 1,055 ৳
AC Berth 1,560 ৳

Mahanagar Godhuli Seat Plan & Classes

The Mahanagar Godhuli offers multiple carriage categories to suit varying passenger preferences, including Snigdha (AC Chair), Shovon Chair, and comfortable AC Berth sleeper cabins. The coaches utilize modern materials designed for safety and ease of travel.

The seat plan for the Snigdha (AC Chair) carriages is arranged in a spacious 2x2 setup with adjustable backrests. The budget-oriented Shovon Chair coaches are organized in a standard intercity 3x2 seating configuration to maximize carriage volume. The total passenger capacity for each run is designed to comfortably support approximately 700 to 800 travelers across all joined coaches.

Snigdha (AC) 2x2 Rows • Cushioned Seats • Air Conditioned
Shovon Chair 3x2 Rows • Budget Friendly • High back support
AC Berth Sleeper Compartment • Night Transit Comfort

Mahanagar Godhuli Off Day

Note: The Mahanagar Godhuli has no weekly off day. It operates 7 days a week.

How to Check Mahanagar Godhuli Train Location (Live Tracking)

Bangladesh Railway provides real-time location feedback via SMS-based transit cellular telemetry. Passengers can easily query the current station position and coordinates from any active Bangladeshi mobile operator (including Grameenphone, Robi, Banglalink, Teletalk, or Airtel).

Step 1: Write SMS

Create a new text message. Type the tracking command code exactly as shown below:

TR 703
Step 2: Send Message

Send this SMS to the official Bangladesh Railway short-code terminal number:

16318
Step 3: Instant Feedback

You will instantly receive a return text message outlining the last parsed station pass, delay minutes, and live speed.

* SMS carrier rates apply.

Interactive Route Station Timetable & Fare Calculator

Select your boarding and destination stations directly from the timeline to dynamically view custom class fares and step-by-step durations.

Click stations on the timeline to select boarding & destination

  1. Chattogram

    Origin (Set Boarding)

    Official Departure Station

    Departs: 03:00 PM
  2. Feni

    (Set Boarding)

    Halt Duration: 02 mins (Arr: 04:20 PM)

    Departs: 04:22 PM +1 hr 20 mins from prev stop
  3. Gunabati

    (Set Boarding)

    Halt Duration: 02 mins (Arr: 04:36 PM)

    Departs: 04:38 PM +14 mins from prev stop
  4. Laksam

    (Set Boarding)

    Halt Duration: 02 mins (Arr: 05:04 PM)

    Departs: 05:06 PM +26 mins from prev stop
  5. Cumilla

    (Set Boarding)

    Halt Duration: 02 mins (Arr: 05:27 PM)

    Departs: 05:29 PM +21 mins from prev stop
  6. Akhaura

    (Set Boarding)

    Halt Duration: 03 mins (Arr: 06:20 PM)

    Departs: 06:23 PM +51 mins from prev stop
  7. Brahmanbaria

    (Set Boarding)

    Halt Duration: 04 mins (Arr: 06:41 PM)

    Departs: 06:45 PM +18 mins from prev stop
  8. Bhairab Bazar

    (Set Boarding)

    Halt Duration: 03 mins (Arr: 07:05 PM)

    Departs: 07:08 PM +20 mins from prev stop
  9. Narsingdi

    (Set Boarding)

    Halt Duration: 02 mins (Arr: 07:36 PM)

    Departs: 07:38 PM +28 mins from prev stop
  10. Dhaka

    Terminal (Set Boarding)

    Intermediate Junction stop

    Arrives: 08:45 PM +1 hr 7 mins from prev stop

Trip Selection Control

Boarding Station
Select from timeline...
Destination Station
Select from timeline...

No segment selected

Click on your starting station, then your ending station on the left timeline to see instant durations and BDT fares.

Direct Segment Routes (45)

This train serves the following direct segment routes. Major hub connections are shown below. Click any link to view specialized timetables and ticketing details.

Frequently Asked Questions (FAQ)

Find accurate, up-to-date answers to common queries about the Mahanagar Godhuli schedule, route, off days, ticketing, and live location updates:

Q What is the schedule of Mahanagar Godhuli?

Mahanagar Godhuli departs from Chattogram at 03:00 PM and arrives at Dhaka at 08:45 PM.

Q What is the ticket price for Mahanagar Godhuli?

The ticket prices for Mahanagar Godhuli range from 320 ৳ to 1,560 ৳ depending on the seat class selected.

Q Does the Mahanagar Godhuli have a weekly off day?

No, the Mahanagar Godhuli operates 7 days a week with no weekly off day.

Q How can I track the live location of Mahanagar Godhuli?

To track the live location of Mahanagar Godhuli, send an SMS with "TR 703" to 16318 from any mobile operator in Bangladesh.